TMCNet:  The Role of Multimodel Climate Forecasts in Improving Water and Energy Management over the Tana River Basin, Kenya [Journal of Applied Meteorology and Climatology]

[December 14, 2013]

The Role of Multimodel Climate Forecasts in Improving Water and Energy Management over the Tana River Basin, Kenya [Journal of Applied Meteorology and Climatology]

(Journal of Applied Meteorology and Climatology Via Acquire Media NewsEdge) ABSTRACT The Masinga Reservoir located in the upper Tana River basin, Kenya, is extremely important in supplying the country's hydropower and protecting downstream ecology. The dam serves as the primary storage reservoir, controlling streamflow through a series of downstream hydroelectric reservoirs. The Masinga dam's operation is crucial in meeting power demands and thus contributing significantly to the country's economy. La Niha-related prolonged droughts of 1999-2001 resulted in severe power shortages in Kenya. Therefore, seasonal streamflow forecasts contingent on climate information are essential to estimate preseason water allocation. Here, the authors utilize reservoir inflow forecasts downscaled from monthly updated precipitation forecasts from ECHAM4.5 forced with constructed analog SSTs and multimodel precipitation forecasts developed from the Ensemble-Based Predictions of Climate Changes and their Impacts (ENSEMBLES) project to improve water allocation during the April-June and October-December seasons for the Masinga Reservoir. Three-month-ahead inflow forecasts developed from ECHAM4.5, multiple GCMs, and climatological ensembles are used in a reservoir model to allocate water for power generation by ensuring climatological probability of meeting the end-of-season target storage required to meet seasonal water demands. Retrospective reservoir analysis shows that inflow forecasts developed from single GCM and multiple GCMs perform better than use of climatological values by reducing the spill and increasing the allocation for hydropower during above-normal inflow years. Similarly, during below-normal inflow years, both of these forecasts could be effectively utilized to meet the end-of-season target storage by restricting releases for power generation. The multimodel forecasts preserve the end-of-season target storage better than the single-model inflow forecasts by reducing uncertainty and the overconfidence of individual model forecasts.


(ProQuest: ... denotes formulae omitted.) 1. Introduction Recent studies focusing on the teleconnection between sea surface temperature (SST) conditions and regional-continental hydroclimatology show that interannual and interdecadal variability in exogenous climatic indices modulate both global- and regional-scale rainfall (Ropelewski and Halpert 1987) and streamflow patterns (e.g., Dettinger and Diaz 2000; Piechota and Dracup 1996). Advancements in understanding the linkages between exogenous climatic conditions such as tropical SST anomalies and local-regional hydroclimatology offer the scope of predicting season-ahead and long-lead-time (12-18 months) streamflow (Maurer and Lettenmaier 2003; Souza Filho and Lall 2003). Considerable improvement in the skill of seasonal climate forecasts over the last decade has also been achieved using the slowly evolving boundary conditions such as SSTs in the tropical oceans (Goddard et al. 2003). Seasonal forecasts of streamflow could also be utilized effectively for multipurpose water allocation and to prepare adequate contingency measures to mitigate hydroclimatic disasters (Voisin et al. 2006; Georgakakos and Graham 2008; Golembesky et al. 2009). Hence, the application of climate-based information for water man- agement has been shown to result in improved benefits over the long term in comparison to the benefits that would be obtainable under no-forecast- (climatology) based operation. Still, application of climate forecasts for improving water management faces various challenges partly because the uncertainty in climate forecasts (Pagano et al. 2001, 2002) as well as because of the challenges in translating probabilistic forecasts for operational guid- ance (Sankarasubramanian et al. 2009).

Recent studies on operational streamflow forecast development show that seasonal streamflow forecasts downscaled from monthly updated climate forecasts are quite effective in reducing the uncertainty in intra- seasonal water allocation (Sankarasubramanian et al. 2008, 2009). Efforts to reduce uncertainty in climate forecasts have also focused on combining climate fore- casts from multiple climate models (Rajagopalan et al. 2002; Devineni and Sankarasubramanian 2010a,b). Re- cent studies based on a multimodel combination ap- proach indicate better streamflow forecasting skill than any individual forecast models, as the skill of the multimodel ensembles is maximized by assigning op- timal weights to each general circulation model (GCM; Robertson et al. 2004; Devineni and Sankarasubramanian 2010a,b). Studies have also shown the utility of multimodel streamflow forecasts derived from low-dimensional models in invoking restrictions and water conserva- tion measures during drought years (Golembesky et al. 2009). Low-dimensional models primarily em- ploy the dominant modes of variability in the pre- dictors (e.g., precipitation forecasts from GCMs) to explain the variability in the predictand (e.g., precipitation-streamflow). For instance, Golembesky et al. (2009) utilized probabilistic multimodel streamflow forecasts to invoke water-use restrictions for improving the operation of Falls Lake Reservoir in the Neuse basin during below-normal inflow years. One impor- tant use of multimodel climate forecasts is in reducing the overconfidence of individual models, resulting in fewer false alarms and missed targets (Devineni and Sankarasubramanian 2010a; Weigel et al. 2008). This has important implications since multimodel climate forecasts can increase the confidence of stakeholders toward application of climate information for water management.

The main intent of this study is to evaluate the per- formance of probabilistic streamflow forecasts devel- oped from single-GCM and from multimodel climate forecasts in improving the hydropower generation for the Tana River basin, Kenya. The Tana River basin accounts for about 57% of the total hydropower gener- ated in Kenya and our analysis is focused on the Masinga Reservoir system, which accounts for about 67% of the total storage capacity in the Tana River basin. For developing the reservoir inflow forecasts, the study uti- lizes 3-month-ahead precipitation forecasts from the ECHAM4.5 GCM forced with constructed analog SST forecasts and the multimodel climate forecasts developed from the study of Devineni and Sankarasubramanian (2010a). The reservoir management model adopted here is a simplified version of the dynamic allocation frame- work reported by Sankarasubramanian et al. (2009).

The manuscript is organized as follows: Section 2 pro- vides baseline information on the Tana River basin and its linkage to El Niho-Southem Oscillation (ENSO) along with the seasonal streamflow forecasts developed from ECHAM4.5 and from multimodel climate forecasts. Fol- lowing that, we present a brief description of the Masinga Reservoir simulation model and the retrospective reser- voir analyses design. Section 4 compares the utility of streamflow forecasts derived from ECHAM4.5 and mul- tiple climate models with climatology in improving the hydropower generation from the Masinga Reservoir. In section 5, we summarize the findings of the study and also give conclusions.

2. Hydroclimatology of the Tana basin and streamflow forecasts development Kenya experienced major extreme climatic events in the recent past such as El Niho-related floods in 1997/98 and 2009/10 and La Niha-related droughts in 1999/2000 and 2008/09, which led to severe socioeconomic impacts in the country. Specifically, inadequate rainfall during the prolonged 1999/2000 drought led to severe water scarcity and shortage in electrical power supply causing serious power rationing throughout the country. In particular, the estimated losses in hydropower genera- tion and industrial production due to water shortage during the 1999/2000 drought were over 2 billion U.S. dollars (Mogaka et al. 2006). Such enormous losses re- lated to the extreme events underscores the need to translate the climate-based streamflow forecast infor- mation into planning, risk management, and decision making to minimize socioeconomic impacts and to meet increased energy demands in the near future.

Kenya is highly dependent on hydropower, which con- stitutes over 75% of the total electricity generated in the country. The bulk of this electricity is obtained from five generating plants along the upper Tana River basin (Fig. la), namely Masinga (40 MW), Kamburu (94.2 MW), Kindaruma (44 MW), Gitaru (225 MW), and Kiambere (156 MW), typically known as the Seven-Forks Dams (see Fig. la). Kenya Electricity Generating Company Limited is the leading electric-power-generation company in Kenya, producing about 80% of electricity from hydropower. The Masinga dam, the uppermost reservoir, controls the flow of water through a series of downstream hydroelectric reser- voirs. The Masinga catchment area lies between 0°7' and 1°15'S and 36°33' and 37°46'E and has an area of about 7354 km2. The reservoir has a capacity of 1560 X 106m3 at full supply level (FSL) with a surface area of 120 km2. The spillway for Masinga dam is 1056.5 m above mean sea level, which corresponds to the FSL. The minimum operating level is 1035.0 m above mean sea level. Tana River basin experiences bimodal precipitation pattern and accordingly dominant runoff seasons occur during April-June (AMJ) and October-December (OND). Observed inflows at the Masinga dam are available from 1940 until the present. Inflows during AMJ, which are heavily influenced by SST variations in the Indian Ocean (Mutai and Ward 2000), contribute more than 46% of the total annual inflows into the dam (Fig. lb). Inflows during the OND season account for 26% of the annual flows and its interannual variations are significantly associated with ENSO variations (Mutai and Ward 2000). Die correlation between OND flows and July-September (JAS) Niño-3.4, a commonly used index denoting ENSO conditions that indicates the average SSTs over 170°-120°W and 5°S-5°N, over the 1947-2005 period is 0.42. Diis strong association between SST and inflows in- dicates the potential in linking climate forecasts for de- veloping season-ahead inflow forecasts for the Tana River basin.

Seasonal streamflow forecasts based on exogenous climate indices can be obtained using both dynamical and statistical modeling approaches. The dynamical modeling involves coupling of a hydrological model with a regional climate model that preserves the boundary conditions specified by the GCM by considering the topography of a region (e.g., Leung et al. 1999; Nijssen et al. 2001). However, uncertainty propagation from the coupling of these models (Kyriakidis et al. 2001) and converting the gridded streamflow-precipitation forecasts into reservoir inflow forecasts poses serious challenges in employing dynamical downscaling for water manage- ment applications. On the other hand, statistical model- ing basically employs statistical models to downscale GCM outputs to develop streamflow forecasts at a de- sired location (Gangopadhyay et al. 2005). Studies have also related well-known climatic modes to observed streamflow in a given location using a variety of statistical models ranging from simple regression (e.g., Hamlet and Lettenmaier 1999) to complex methods such as linear discriminant analysis (Piechota et al. 2001), spatial pat- tern analysis (Sicard et al. 2002), and semiparametric resampling strategies (Souza Filho and Lall 2003). Al- though both approaches have their advantages and limi- tations, statistical modeling approach is the least data intensive and is very relevant in regions such as Kenya, where high-resolution spatial data to run regional climate and hydrologic models are not readily available.

Multimodel inflow forecast development using multimodel climate forecasts The primary intent of this paper is to utilize inflow forecasts developed using multimodel climate forecasts and compare their performance with inflow forecasts developed using single GCMs and with climatological inflows. Recent studies on reducing the uncertainty of climate forecasts show that combining multiple models result in reduced false alarms and missed targets resulting in improved probabilistic climate forecasts (Rajagopalan et al. 2002; Devineni and Sankarasubramanian 2010b). In this study, we utilize the multimodel precipitation fore- casts developed by Devineni and Sankarasubramanian (2010b) for developing multimodel inflow forecasts for the Masinga Reservoir. The multimodel precipitation forecasts for the AMJ and OND seasons are developed by com- bining five coupled GCMs (CGCMs) and climatology (i.e., observed precipitation) based on the methodology de- scribed in Devineni and Sankarasubramanian (2010b). The precipitation forecasts from multiple models along with the climatology are combined by analyzing the skill of the candidate models contingent on the Niho-3.4 state. The main advantage of combining multiple GCMs con- ditional on the predictors' state is that the approach as- signs higher weights for climatology and lower weights for the CGCMs particularly if the skill of a candidate model is poor under ENSO conditions. For additional details and a complete discussion on the multimodel combina- tion methodology, see Devineni and Sankarasubramanian (2010a,b).

Retrospective precipitation forecasts from the European Union's Ensemble-Based Predictions of Climate Changes and their Impacts (ENSEMBLES) project (Weisheimer et al. 2009) were used to develop the multimodel forecasts over the Masinga River basin. Table 1 provides details on the five CGCMs considered in the ENSEMBLES ex- periment for developing multimodel precipitation fore- casts. Seven-month-ahead retrospective climate forecasts were developed on 1 February, 1 May, 1 August, and 1 November for the period 1960-2005 using the respective months' initial conditions. For this study, we considered CGCMs' SST forecasts and precipitation forecasts issued on 1 February (1 August) to develop multimodel pre- cipitation forecasts. For instance, monthly precipitation forecasts issued in 1 February (1 August) for the period AMJ (OND) are converted into tercile forecasts for each CGCM and the tercile forecasts are combined based on the Devineni et al. (2008) algorithm to develop the multimodel tercile forecasts. Given the tercile probabili- ties PFj'7 with i (1 = below normal, 2 = normal, and 3 = above normal) denoting the tercile categories, / (1 = AMJ and 2 = OND) indicating the season, and t denoting the year of forecast over the period 1960-2005, we estimated the conditional mean /xj and conditional variance <xj of the forecast using Eqs. (1) and (2) by assuming the conditional distribution as normal. Given climatological 33rd and 67th percentiles R0'33'7 and R067'7 for a given season, we used the tercile probabilities issued for a given season in a particular year to estimate the condition mean and vari- ance by solving the simultaneous equations in Eqs. (1) and (2): ... (1) ... (2) The standard normal variates z3,7 and z3,7 are obtained based on the inverse of the cumulative distribution function of the standard normal distribution with the respective cumulative probabilities CF37 = PF3,7 and CF3,7 _ pp y + PF3,7 being computed based on the tercile precipitation forecasts. Once we obtain the conditional mean /xj and conditional variance <xj we can generate realizations from the normal distribution. The condi- tional mean of the multimodel forecast over the Masinga catchment area over four grid points (Fig. la) and the previous month streamflow Qt-\ were used as predictors in the principal component regression to develop the inflow forecasts for the Masinga dam. We capture the role of initial land surface conditions by using the pre- vious month's streamflow as a predictor in developing streamflow forecasts. Filled stars in Fig. la indicate the selected grid points of multimodel precipitation fore- casts, and open stars indicate the selected grid points of precipitation forecasts from the ECHAM4.5 GCM. We considered principal component regression, since the forecasts from these four grid points were correlated. All the GCMs from the ENSEMBLES experiment and ECHAM4.5 atmospheric GCM were almost at the same resolution. Our previous study combined the individual CGCMs' precipitation forecasts to develop multimodel precipitation forecasts.

To compare the performance of multimodel climate forecasts, we also consider precipitation forecasts from a single GCM-ECHAM4.5 forced with constructed analog SSTs. Retrospective precipitation forecasts from ECHAM4.5 are available at the International Research Institute (IRI) for 7 months in advance for every month beginning January 1957 with a resolution of 2.8° X 2.8° (http://iridl.ldeo.columbia.edu/SOURCES/.IRI/.FD/. ECHAM4p5/.Forecast/ca_sst/.ensemble24/.MONIHLY/. prec/). To force the ECHAM4.5 with SST forecasts, ret- rospective monthly SST forecasts were developed based on the observed SST conditions in that month based on the constructed analog approach. For additional details on ECHAM4.5 precipitation forecasts, see Li and Goddard (2005; http://iri.columbia.edu/outreach/publication/report/ 05-02/report05-02.pdf). The ensemble mean, which is computed from 24 realizations of ECHAM4.5 precip- itation forecasts obtained based on different initial conditions, was downloaded over the Masinga catchment area from the IRI data library for the period 1957-2005. We utilize the ensemble mean of precipitation forecasts issued at the beginning of two rainy seasons (AMJ and OND), 1 April and 1 October, along with the previous month's streamflow (March-September) as an additional predictor. Though this results in a comparison of pre- cipitation forecasts from multimodels and ECHAM4.5 at two different lead times, from the perspective of water management the allocation decisions are usually done at the beginning of the season. Thus, in the context of ap- plication, the best single-model forecast available at the beginning of the season is used.

Principal components regression (PCR) Since the gridded precipitation forecasts over a given region are spatially correlated, employing precipitation forecasts from multiple grid points as predictors would raise multicollinearity issues in developing the regression. PCR, which is a commonly employed approach in model output statistics (Wilks 1995), eliminates systematic errors and biases in GCM fields and also recalibrates the principal components (PCs) of GCM fields to predict the hydro- climatic variable of interest using regression analyses. In this context, the predictand is the streamflow Qt over the season (AMJ-OND) and the predictors are the previous month streamflow Qt-\ and the ensemble mean of pre- cipitation forecasts from ECHAM4.5 GCM or the multi- model ensemble mean obtained using Eqs. (1) and (2). Using the principal components of the predictors, we de- veloped a regression relationship based on Eq. (2): ... (3) where Qt denotes the observed streamflow during the AMJ-OND season in year t, PCf denotes the /cth PCs from the retained K PCs of precipitation forecasts, and ßs denote the regression coefficients whose estimates are obtained by minimizing the sum of squares of error. We employed stepwise regression to select K PCs out of the rotated grid points of precipitation for developing the PCR model.

Using PCR, we developed single-model (SM) inflow forecasts and multimodel (MM) inflow forecasts to ob- tain the leave-one-out cross-validated mean seasonal (conditional mean) streamflow forecasts for the AMJ (OND) season. Using the point forecast error obtained from the PCR, we obtained the conditional variance of the seasonal streamflows to develop the probabilistic reservoir inflow forecasts. Residual analyses of the PCR based on the quantile plots and skewness test on the residuals showed that the normality assumption is valid. This indicates that the seasonal flows during the AMJ and OND season could be assumed as a lognormal dis- tribution. Based on this assumption, we developed 500 ensembles of the seasonal streamflows in log space us- ing the conditional mean and the point forecast error obtained from the PCR. These ensembles are eventually transformed back to the original space for developing the probabilistic inflow forecasts that could be forced with the Masinga Reservoir model.

Figure 2a (Fig. 2b) shows the conditional mean of the SM and MM seasonal streamflow forecasts for the pe- riod 1991-2005 developed based on the ECHAM4.5 and multimodel precipitation forecasts for the AMJ (OND) seasons. All the forecasts for the single model (multimodel) in Fig. 2 are obtained in a leave-one-out cross-validated mode using the observed flows and the predictors for the period 1961-2005 (1961-2005). Since the multimodel climate forecasts from ENSEMBLES project are available only up to 2005, we have evaluated the skill of the multimodel inflow forecasts only up to 2005. The inset in Fig. 2 shows the verification statistics for the multimodel (single model) inflow forecasts based on correlation coefficient and root-mean-square error computed between the ensemble mean of the forecasted streamflow and the observed streamflow over the period 1961-2005 (1961-2005). From Fig. 2, we observe that the multimodel streamflow forecasts perform slightly better than the single-model forecasts in predicting the condi- tional mean. It is important to note that the single-model inflow forecasts for the AMJ and OND seasons were de- veloped using 3-month-ahead ECHAM4.5 precipitation forecasts issued at the beginning of April and October, respectively. On the other hand, the multimodel precip- itation forecasts issued at the beginning of 1 February and 1 August were employed in developing the AMJ and OND inflow forecasts, which results in a lead time of two months for both seasons. We use these leave-one-out cross-validated probabilistic streamflow forecasts available to the probabilistic reservoir simulation model over the period 1991-2005 for evaluating the utility of streamflow forecasts developed from single-model and multimodel precipitation forecasts in improving the water and energy management for the Masinga Reservoir.

3. Masinga Reservoir simulation model The reservoir simulation model used here is a simpli- fied version of the detailed dynamic water-allocation framework presented in Sankarasubramanian et al. (2009). Given seasonal (T-month lead) streamflow forecasts (as ensembles) qkt and initial reservoir storage St-\ at the be- ginning of the allocation period, the reservoir simulation model determines the seasonal release Rk and Rfor hydropower generation and city of Nairobi water supply, respectively. Here, t = 1, 2, ... , N denotes the forecast years (N = total number of years of retrospective fore- casts; 1991-2005 for multimodel forecasts and 1991-2005 for ECHAM4.5 downscaling), and the k = 1, 2, ... , K index represents a particular realization within the en- semble. In addition, the water-allocation model incorpo- rates an end-of-season target storage Sf (Tdenoting the forecast lead time in months) that is associated with a failure probability ps. For instance, in the case of the Masinga Reservoir, corresponds to the target storage of 1572 MCM (1560 MCM) at the end of June (December) for meeting the demand during the months with low rainfall (here MCM is million cubic meters). Figure 3a shows the operational rule curves for the Masinga dam. Using the basic continuity equation, the seasonal stor- age equations for each ensemble member k are updated for the forecasting year t: ... (4) where seasonal storage equations are constrained so that the storage is between the minimum and maximum possible storage, 5min and Smax, respectively: ... (5) The term SP¿V is the spill that occurs if 5^, > Smax, and could be obtained based on the constraints from Eqs. (4) and (5). The release for hydropower ^^ydro js converted into net hydropower HP, generated from the turbines based on the elevation storage relationship of the res- ervoir. Evaporation Ek is also computed as a function of average storage during the season using the water spread area and storage information of the reservoir specified in Eq. (6): ... (6) where ijjt = seasonal evaporation rate and ¿q and S2 = coefficients describing the area-storage relationship. We employed the spline interpolation technique for obtaining the water spread area corresponding to the average sea- son storage computed for each ensemble. It is important to note that the evaporation is evaluated implicitly for each realization in the ensemble. The estimated average evaporation rate (ff) = 0.402 and 0.502 mm for the AMJ and OND seasons, respectively.

The objective is to determine Rk such that the prob- ability of having the end-of-season storage Sr,t less than the target storage Sf is small, which is represented by its failure probability (Prob) ps using ... (7) Given that the water supply release is very small (35 MCM) relative to the hydropower release, we consid- ered climatological probability for ps (=0.5), which im- plies that the target storage could be violated 50% of the time under the retrospective forecast-based analysis. Reducingps will result in reduced releases for hydropower resulting in increased spill from the reservoir.

Prior to performing the retrospective reservoir analyses using the streamflow forecasts, we performed model ver- ification from 1991 to 2005 by comparing the reservoir model's ability to simulate the observed end of June storages. Ilie simulations were performed by forcing the model with the observed flows during AMJ and initial storages in April to determine the end-of-June storages by allocating the reported releases for water hydropower generation. Figure 3b shows the observed and model predicted stages at the end of June-the end-of-season stage. The observed and modeled storages obtained from the reservoir model were converted into stages using the available stage-storage relationship for the Masinga Reservoir. From Fig. 3b, we understand that the devel- oped model is quite reasonable in predicting the observed June storages upon simulation with observed flows and the reported hydropower and water supply releases. This gives us confidence in employing the simulation model presented here for further analyses that utilize the sea- sonal streamflow forecasts from two models for improving water and energy management.

In this study, we consider three inflow forecasting schemes: 1) streamflow developed using ECHAM4.5 precipitation forecasts, 2) multimodel precipitation fore- casts obtained by combining five GCMs from the ENSEMBLES project, and 3) climatological ensemble. Each scheme provides 500 members-realizations for a given season indicating the conditional distribution of the inflows into the Masinga dam. The climatological ensemble for each season is obtained by leaving out the particular year's observation from the observed inflow (1940-2005) with the remaining 70 years having equal chances of getting selected in the ensemble. This is rea- sonable, since the lag-1 correlation on the seasonal flows is almost zero. For each of the forecasting schemes, we first obtain the ps. Based on the end-of-season target storage probabilities estimated from climatological forecasts (ac- cepted climatological risks), we explore the possibilities of modifying the releases from current releases to increase the power generated during above-normal storage con- ditions and impose restrictions during below-normal storage conditions. For instance, if the climate-information- based forecasts (i.e., schemes 1 and 2) suggest lower (higher) probability of St == Sf being less than 0.5, then we increase (decrease) the releases such that ps = 0.5. Thus, we obtain revised releases for the single-model and multimodel inflow forecasts as well as for the climato- logical ensemble by ensuringps = 0.5 for each year during 1991-2005. Using the revised releases for each of the three forecasting schemes, we run the reservoir model with the observed inflows to obtain the end-of-season target storages. The basis for comparing the performance of the three forecasting schemes is based on the end-of- season target storages, spill, and generated hydropower by combining the releases that ensures ps = 0.5 under the three forecasting schemes with the observed inflows for the period 1991-2005. This retrospective analysis similar to our previous studies (Golembesky et al. 2009; Sankarasubramanian et al. 2009) provides us an under- standing of what would have happened if the candidate inflow forecasts were applied over the period 1991-2005.

4. Results and analysis This section presents the retrospective analyses for understanding the utility of single-model and multi- model inflow forecasts in improving the hydropower generation for the Masinga dam utilizing the three candidate forecasting schemes. Since the multimodel forecasts are available only up to 2005, all the results presented in this section consider the period 1991-2005 for multimodel forecasts, whereas results for single-model forecasts and climatological ensemble are presented for the period 1991-2005.

a. End-of-season target storage probabilities To begin with, we first evaluate the ability of the three candidate forecasting schemes in estimating the probability of meeting the June and December stor- age for the reported seasonal releases from Masinga over the period 1991-2005 without constraining the releases being ps = 0.5. Given that most of the reservoirs can hold water for more than the seasonal demand, the entire demand could be met with 100% reliability. However, we can modify the reservoir releases by com- paring the ability of the three forecasting schemes in es- timating probability of meeting the end-of-season target storage [ Prob(5/ < S'f )|.

Figure 4 shows the estimates of Prob(5r<5y) for the three forecasting schemes where Sf = 1560 MCM and S'* = 1572 MCM for the AMJ (Fig. 4a) and OND (Fig. 4b) seasons, respectively. Die probability estimates shown were obtained from each streamflow forecasting model and from climatological ensembles. Figure 4 also shows the observed streamflows (Q,) in each year sug- gesting their tercile category [Q, < 0.33 percentile-below normal (Obs_BN); Q, < 0.66 percentile-above normal (Obs_AN); otherwise-normal (Obs)]. Both Figs. 4a (AMJ releases) and Fig. 4b (OND releases) demonstrate that the estimates of Prob(5r<5y) vary depending on the forecasted streamflow potential by each model. Since all the three inflow forecasts were run with the same initial conditions recorded at the beginning of the season in the Masinga dam, any difference in estimating the Prob (5/ < Sj- ) among the forecasts should be primarily due to the skill of the inflow forecasts.

Figures 4a and 4b show clearly that the estimates of Prob (5V < 57 ) from streamflow forecasts are above (be- low) the estimates of Prob(57 < Sf ) from climatological ensembles during below-normal (above normal) inflow conditions, which indicates the skill of the inflow forecasts in predicting the observed inflows during the AMJ and OND seasons. J'his is expected as the probability of at- taining the end-of-season target storage will be low (high) during below-normal (above normal) inflow conditions. We also observe that the estimates of Prob(57 <5£) in Figs. 4a and 4b differ for each streamflow forecast, as each forecasts exhibit different skill. During normal years (open circles on the secondary y axis), the difference between the estimates of Prob (57 < Sf ) is very small indicating all the inflow forecasts from three schemes contain similar prob- abilistic information in predicting the season-ahead in- flows. The only exceptions are during AMJ 1995 and AMJ 1997 under which the multimodel forecasts esti- mate Prob(5r < 5y )s are very different from that of ECHAM4.5-based inflow forecasts and climatological ensemble.

Comparing the performance of multimodel inflow fore- casts with inflow forecasts developed using ECHAM4.5 precipitation forecasts, we infer that multimodel forecasts perform more consistently in indicating below-normal inflow storage conditions. For instance, multimodel fore- casts correctly estimate the Prob(5r < Sf ) in comparison to the climatological estimates of Prob(5r < Sf) in years 1993 and 1996 for the AMJ season and in year 2001 for the OND season in predicting the below-normal inflow sea- son. Further, Prob(5r < 5^ ) estimated using single- model inflow forecasts are shown to be significantly higher (Fig. 4) than that of multimodel estimate of Prob(5r<5y) during above-normal and below-normal conditions. ITiis is primarily due to the overconfidence of single model in predicting below-normal and above- normal conditions as reported by previous studies (Weigel et al. 2008; Devineni and Sankarasubramanian 2010a). On the other hand, estimates of Prob(5r<5y) from multimodel forecasts are much closer to the climato- logical estimates of Prob(5r<5y) since multimodel forecasts reduce the overconfidence of individual models resulting in reduced false alarms. Both multimodel and single-model forecasts incorrectly estimate Prob(5r <Sf) for AMJ 2003-an above-normal inflow season-with the model-based target storage probabilities being higher than climatological counterpart. In general, having in- flow forecasts from multiple models provides more confidence in developing appropriate scenarios for application. We present in the next section a more de- tailed comparison on the performance of ECHAM4.5- based inflow forecasts and multimodel in improving the energy management.

b. Hydropower generation for Masinga Reservoir utilizing multimodel forecasts Although the results shown in Fig. 4 did not ensure ps = 0.5 for each forecasting scheme, the estimates of Prob(5r <5y) obtained from the three models show their ability to change according to the nature of in- flow conditions. For the next set of analyses, we ensure ps = 0.5 such that releases from the reservoir could be adjusted so that the desired end-of-season target storage probability is maintained. The basis behind this analysis is that the user accepts risk of meeting the target storage based on climatological inflows derived using observed inflows. The idea is that releases (Fig. 5) are adjusted by ensuring the ps = 0.5 for both forecasted and climato- logical inflows and then those releases are validated by estimating the actual hydropower generation (Fig. 6), spill (Fig. 7) and the end-of-season storage (Fig. 8) that could have occurred based on the actual inflows during the season.

Given that ps = 0.5 for each season in a given year, we utilize the three forecasting schemes to modify the res- ervoir releases to increase (reduce) hydropower genera- tion if the inflow forecasts suggest above-normal (below normal) conditions. For instance in AMJ 1998 (above- normal inflow year), in Fig. 4, estimates of Prob(5r <Sf ) are almost zero for both single-model and multimodel forecasts indicating that the probability of attaining the target storage is very high. Hence, given that the accepted risk in meeting the target storage (ps) is 0.5, one can in- crease the water releases (determined from the reservoir simulation model) for hydropower generation to meet the target storage constraint. Similarly, during AMJ 2000 (below-normal inflow year), since both forecast models suggest that the probability of meeting the target storage is very low, we can enforce restrictions on the releases for hydropower to ensure ps = 0.5. Such information on re- duced potential of generating hydropower could be uti- lized for increasing the firm power generation from other systems.

The main intent of this study is to understand the utility of multimodel streamflow forecasts in improving the water allocation for hydropower generation. For this purpose, the AMJ-OND multimodel inflow forecasts are utilized to modify the releases for hydropower gen- eration over the 3-month period in the season during 1991-2005 by enforcing the end-of-season storage con- straint to be equal to 0.5. We used the observed storage on 31 March (30 September) of each year during 1991-2005 as the initial storage (5,_i) for the AMJ (OND) season. By combining the streamflow forecasts(<7tk) issued in March (September) with the observed storage at the end of March (September), we obtain releases for hydropower use Rf by constraining ps = 0.5 in Eq. (7). The revised releases that constraints ps = 0.5 are com- bined with the observed inflows to infer what could have happened on the generated hydropower and in meeting the target storage if the forecast-suggested inflows were used as the allocation policy for the season.

Figure 5 shows the estimated difference in the releases obtained using climatological ensemble (forecasting scheme 3) to the releases suggested by the single-model and multimodel forecasts for improving hydropower generation for the AMJ (Fig. 5a) and OND (Fig. 5b) seasons over the period 1991-2005. The releases for all the three forecasting schemes are obtained by ensuring ps = 0.5. The figure also shows the actual observed inflow during the period as below-normal, normal, or above- normal conditions on the secondary y axis. A positive (negative) change indicates that the model suggests a higher probability of not meeting the target storage, re- sulting in reduced (increased) release from the climato- logical ensembles predicted releases. From Fig. 5, we observe that single-model and multimodel forecasts suggest an increase (decrease) in releases compared to during above-normal (below normal) inflow years. Further, we can also see that the multimodel forecasts suggest more water release during above-normal years than do single-model forecasts. Similarly, during below- normal years, the multimodel forecasts suggest more reduction in release from the actual observed release than do SM forecasts.

Given that the Masinga Reservoir is primarily oper- ated for hydropower generation, we also estimated the amount of hydropower (GWh) that results each year from operating the reservoir based on the seasonal forecasts. In other words, we combine the model de- termined releases with observed inflows to simulate to actual amount of hydropower that is generated based on the storage-elevation relationship of the reservoir. Figure 6 shows the estimated change in generated hy- dropower from the reservoir from both the forecasts. Analogous to Fig. 5, we can observe from Fig. 6 that the forecasts suggest an increase (decrease) in generated hydropower during above-normal (below normal) inflow years. It is important to note that the increase in hydro- power generated during the above-normal years results from an increased allocation of water for power genera- tion. This also in turn results in a reduced spill from the reservoir during above-normal inflow years. The esti- mated spill each year for both the seasons is shown in Fig. 7. We observe that for most of the years the spill obtained from the forecast models is less than the spill suggested by the climatological ensemble. This indicates that the model is actually releasing additional water for hydropower generation during above-normal years.

We can always increase the allocation for any use by allocating additional water. But such an increase should not come at the cost of failing to meet the target storage. To evaluate whether the changes in releases do not result in increased-decreased storage at the end of the season, we show the simulated end-of-season [June (Fig. 8a) and December (Fig. 8b)] storages from 1991 to 2005 by combining the forecast-suggested releases from both the models with the observed flows. We observe that during below-normal years the simulated end-of-season storage is less than the target storage Sj-. From Fig. 8, it is clear that the multimodel forecast-suggested releases keep the storages very close to the target storage in comparison with the storages obtained using the single- model forecasts and the climatological ensemble. The only exceptions are during AMJ 2004 and AMJ 2005 where the multimodel forecasts suggest an increased release resulting in a storage that is less than the target storage. This is a clear case of multimodel forecasts failing to estimate the target storage. During the rest of the years on both seasons, multimodel forecasts estimate the storages closer to the target storage.

The retrospective reservoir analysis presented in this study can be utilized to determine the appropriate sea- sonal releases in conjunction with the future streamflow potential. If the forecasts suggest an above-normal in- flow year, then the Prob(5r<5y) will be lower than its climatological probability, forecast-based allocation would facilitate the opportunity to relax the restrictions and thereby release more water for hydropower gener- ation and reduce downstream flood risk. In other words, the reservoir operators can consider additional releases such that the forecast-based estimates of Prob(5r < Sf ) are equal to its climatological probability of ps = 0.5. Similarly, during below-normal years, one can consider the options of enforcing restrictions on the releases to ensure the end-of-season target storage is met with a probability equal to climatological probability. By sug- gesting a reduction in hydropower generation during below-normal inflow years, the system's resilience in rebounding to normal operation is improved by hedging additional water to meet future demand.

c. Discussion Results from the multimodel climate forecasts im- prove the forecast skill by reducing the overconfidence of individual models (Weigel et al. 2008; Devineni and Sankarasubramanian 20010a,b). The intent of this study is to utilize them in applying them for improving res- ervoir management. For this purpose, we considered multimodel precipitation forecasts developed by Devineni and Sankarasubramanian (2010b) for developing sea- sonal inflow forecasts into Masinga Reservoir in the Tana River basin, Kenya. Inflow forecasts developed from multimodel and ECHAM4.5 clearly show that multimodel forecasts have improved skill in predicting the observed flows (Fig. 3). Utilizing analyses presented in Fig. 4 clearly shows that multimodel forecasts reduces the over- confidence of individual model forecasts and also re- duces false alarms (e.g., year 1996 in Fig. 4a). Except for very few instances (OND 1991 in Fig. 4b), multi- model forecasts perform better than ECHAM4.5 model- based inflow forecasts in many years (e.g., OND 1995 in Fig. 4b) when compared with individual model forecasts. It is important to note that for both seasons, AMJ and OND, multimodel forecasts are developed two months (February for AMJ and August for OND) ahead of in- dividual model forecasts, which are issued at the begin- ning of the season. Another advantage in using multiple models for analyzing the storage probabilities is during normal years. It is very clear from our analysis that the storage probabilities are around a smaller range indicating that a normal or business-as-usual operation could be pursued.

Analyses in Figs. 5-7 show that inflow forecasts from climate models could be adjusted to meet the climatolog- ical probability of meeting the target storage (ps = 0.5). However, our modeling framework facilitates target storage probability based on stakeholder's choice of interest. However, for such selected probabilities, in- flow forecasts should be carefully analyzed to ensure the forecasts being well calibrated, indicating a good correspondence between forecast probabilities and their observed relative frequencies (Devineni et al. 2008). Such careful analyses on inflow forecasts based on user-selected target storage probabilities would reduce apprehensions on utilizing climate-information-based streamflow fore- casts for improving water and energy management. Our analyses from Fig. 8 also show that forecast-based allo- cation ensures meeting the target storages in both seasons. Since Fig. 8 is obtained by combining forecast-based releases with the observed inflows, it is a validation of the performance of inflow forecasts in meeting the target storage as well as improving the hydropower generation. The lessons from this study also have potential applica- tions for basins in the southeastern United States. This is primarily because both regions are semiarid and the river basins are predominantly belonging to rainfall-runoff regime. From hydroclimate perspectives too, the South- east experiences dry and warm winter during La Niña conditions as like the Tana River basin. Our hydro- climatology research group in collaboration with the State Climate Office of North Carolina has developed an on- line portal (http://www.nc-climate.ncsu.edu/inflowforecast) for disseminating both the inflow forecasts from multiple models and the storage forecasts for the user-specified releases. Our hope is that as multiple climate models are analyzed in developing seasonal forecasts, providing on- line access to both inflow and storage forecast scenarios will result in real-time evaluation and application of climate-information-based streamflow forecasts for im- proving reservoir operations in regions that are signifi- cantly impacted by climate variability.

5. Summary and conclusions A reservoir simulation model that uses ensembles of streamflow forecasts is presented and applied for im- proving the water allocation and thereby the energy management for the Masinga Reservoir in Tana River basin in Kenya. The Masinga Reservoir located in the upper Tana River basin is extremely important in sup- plying the power requirements of the country as well as in protecting the downstream ecology of the Tana River system. The dam serves as the primary storage reservoir, controlling streamflow through a series of downstream hydroelectric reservoirs. Prolonged droughts of 1999- 2001 in the Tana River basin due to La Niña-related conditions resulted in power shortages and prolonged power rationing in Kenya. In this study, we utilize res- ervoir inflow forecasts downscaled from monthly up- dated precipitation forecasts from ECHAM4.5 forced with constructed analog SSTs and multimodel pre- cipitation forecasts developed from the ENSEMBLES project to improve the seasonal water allocation during the April-June and October-December seasons for the Masinga Reservoir in Kenya. Three-month-ahead inflow forecasts developed from ECHAM4.5, multiple gen- eral circulation models, and climatological ensembles are forced into a reservoir simulation model to allocate water for power generation by ensuring climatological probability of meeting the end-of-season target storage that is required to meet the water demands during nonrainy seasons. The forecast-based releases are then combined with observed inflows to estimate storages, spill, and generated hydropower from the system. Ret- rospective reservoir analysis shows that inflow forecasts developed from a single GCM and multiple GCMs per- form better than climatology reduce the spill consider- ably by increasing the allocation for hydropower during above-normal inflow years. Similarly, during below- normal inflow years, both these forecasts could be effec- tively utilized to meet the end-of-season target storage by restricting the releases of water for power-generation uses. Comparing the performance of inflow forecasts developed from multimodels with the inflow forecasts developed using ECHAM4.5 alone, we infer that the multimodel forecasts preserve the end-of-season tar- get storage better in comparison with the single-model forecasts by reducing the overconfidence of individual model forecasts. Thus, considering multiple models for seasonal water allocation reduces the uncertainty related to a single model and provides the inflow forecasts with reduced model uncertainty for improving water and en- ergy allocation.

Acknowledgments. We are thankful to NOAA for providing funding for this research through Grant NA090AR4310146. We also appreciate the comments of three anonymous reviewers that have led to substantial improvements in the manuscript.

REFERENCES Balmaseda, M. A., A. Vidard, and D. L. T. Anderson, 2008: The ECMWF ORA-S3 ocean analysis system. Mon. Wea. Rev., 136, 3018-3034.

Collins, W. J., and Coauthors, 2008: Evaluation of the HadGEM2 model. Met Office Hadley Centre Tech. Note HCTN 74,47 pp.

Daget, N., A. T. Weaver, and M. A. Balmaseda, 2009: Ensemble estimation of background-error variances in a three-dimensional variational data assimilation system for the global ocean. Quart. J. Roy. Meteor. Soc., 135,1071-1094.

Dettinger, M. D., and H. F. Diaz, 2000: Global characteristics of stream flow seasonality and variability. J. Hydrometeor., 1, 289-310.

Devineni, N., and A. Sankarasubramanian, 2010a: Improved cat- egorical winter precipitation forecasts through multimodel combinations of coupled GCMs. Geophys. Res. Lett., 37, L24704, doi:10.1029/2010GL044989.

_____, and _____, 2010b: Improving the prediction of winter pre- cipitation and temperature over the continental United States: Role of ENSO state in developing multimodel combinations. Mon. Wea. Rev., 138, 2447-2468.

_____, _____, and S. Ghosh, 2008: Multimodel ensembles of stream- flow forecasts: Role of predictor state in developing optimal combinations. Water Resour. Res., 44, W09404, doi:10.1029/ 2006WR005855.

Gangopadhyay, S., M. Clark, and B. Rajagopalan, 2005: Statistical downscaling using K-nearest neighbors. Water Resour. Res., 41, W02024, doi:10.1029/2004WR003444.

Georgakakos, K. P., and N. E. Graham, 2008: Potential benefits of seasonal inflow prediction uncertainty for reservoir release decisions. J. Appl. Meteor. Climatol., 47,1297-1321.

Goddard, L., A. G. Barnston, and S. J. Mason, 2003: Evaluation of the IRI's "net assessment" seasonal climate forecasts: 1997- 2001. Bull. Amer. Meteor. Soc., 84,1761-1781.

Golembesky, K., A. Sankarasubramanian, and N. De vine ni, 2009: Improved drought management of Falls Lake Reservoir: Role of multimodel streamflow forecasts in setting up restrictions. J. Water Resour. Plan. Manage., 135 (3), 188-197.

Hamlet, A. F., and D. P. Lettenmaier, 1999: Columbia River streamflow forecasting based on ENSO and PDO climate signals. J. Water Resour. Plan. Manage., 125 (6), 333-341.

Keenlyside, N. S., M. Latif, M. Botzet, J. Jungclaus, and U. Schulzweida, 2005: A coupled method for initializing El Niño Southern Oscillation forecasts using sea surface temperature. Tellus, 57A, 340-356.

Kyriakidis, P. G, N. L. Miller, and J. Kim, 2001: Uncertainty propagation of regional climate model precipitation forecasts to hydrologic impact assessment. J. Hydrometeor., 2,140-160.

Leung, L. R., A. F. Hamlet, D. P. Lettenmaier, and A. Kumar, 1999: Simulations of the ENSO hydroclimate signals in the Pacific Northwest Columbia River basin. Bull. Amer. Meteor. Soc., 80, 2313-2329.

Li, S., and L. Goddard, 2005: Retrospective Forecasts with the ECHAM4.5 AGCM. IRI Tech. Rep. 05-02,16 pp. [Available online at http://iri.columbia.edu/outreach/publication/report/ 05-02/report05-02.pdf.] Maurer, E. P., and D. P. Lettenmaier, 2003: Predictability of sea- sonal runoff in the Mississippi River basin. J. Geophys. Res., 108, 8607, doi:10.1029/2002JD002555.

Mogaka, H., S. Gichere, R. Davis, and R. Hirji, 2006: Climate vari- ability and water resources degradation in Kenya: Improving water resources development and management, World Bank Working Paper 69, Washington, DC, 130 pp. [Available online at http://www-wds.worldbank.org/servlet/WDSContentServer/ WDSP/IB/2006/01/10/000090341_20060110161654/Rendered/ PDF/348540KE0Climal01OFFI CIAL0USE0ONLYl.pdf.] Mutai, C. C, and M. N. Ward, 2000: East African rainfall and the tropical circulation/convection on intraseasonal to interannual timescales. J. Climate, 13, 3915-3939.

Nijssen, B., G. M. O'Donnel, A. F. Hamlet, and D. P. Lettenmaier, 2001: Hydrologic sensitivity of global rivers to climate change. Climatic Change, 50,143-175.

Pagano, T. G, H. C. Hartmann, and S. Sorooshian, 2001: Using climate forecasts for water management: Arizona and the 1997-1998 El Niño. J. Amer. Water Resour. Assoc., 37,1139- 1153.

_____, _____, and _____, 2002: Factors affecting seasonal forecast use in Arizona water management: A case study of the 1997-98 El Niño. Climate Res., 21, 259-269.

Piechota, T. G, and J. A. Dracup, 1996: Drought and regional hy- drologic variation in the United States: Associations with the El Niño-Southern Oscillation. Water Resour. Res., 32,1359-1374.

_____, F. H. S. Chiew, J. A. Dracup, and T. A. McMahon, 2001: Development of exceedance probability streamflow forecast. J. Hydrol. Eng., 6, 20-28.

Rajagopalan, B., U. Lall, and S. E. Zebiak, 2002: Categorical cli- mate forecasts through regularization and optimal combination of multiple GCM ensembles. Mon. Wea. Rev., 130,1792-1811.

Robertson, A. W., S. Kirshner, and P. Smyth, 2004: Downscaling of daily rainfall occurrence over northeast Brazil using a hidden Markov model. J. Climate, 17, 4407-4424.

Ropelewski, C. F., and M. S. Halpert, 1987: Global and regional scale precipitation patterns associated with the El Niño/ Southern Oscillation. Mon. Wea. Rev., 115,1606-1626.

Sankarasubramanian, A., U. Lall, and S. Espinueva, 2008: Role of retrospective forecasts of GCMs forced with persisted SST anomalies in operational streamflow forecasts development. J. Hydrometeor., 9, 212-227.

_____, _____, N. Devineni, and S. Espinueva, 2009: The role of monthly updated climate forecasts in improving intraseasonal water allocation. J. Appl. Meteor. Climatol., 48,1464-1482.

Sicard, E., R. Sabatier, H. Niel, and E. Cadier, 2002: A new ap- proach in space-time analysis of multivariate hydrological data: Application to Brazil's Nordeste region rainfall. Water Resour. Res., 38,1319, doi:10.1029/2002WR001413.

Souza Filho, F. A., and U. Lall, 2003: Seasonal to interannual en- semble streamflow forecasts for Ceara, Brazil: Applications of a multivariate, semiparametric algorithm. Water Resour. Res., 39,1307, doi:10.1029/2002WR001373.

Voisin,N., A. F. Hamlet, L. P. Graham, D. W. Pierce,T. P. Barnett, and D. P. Lettenmaier, 2006: The role of climate forecasts in western U.S. power planning. J. Appl. Meteor. Climatol., 45, 653-673.

Weigel, A. P., M. A. Liniger, and C. Appenzeller, 2008: Can multi- model combination really enhance the prediction skill of probabilistic ensemble forecasts? Quart. J. Roy. Meteor. Soc., 134, 241-260.

Weisheimer, A., and Coauthors, 2009: ENSEMBLES: A new multimodel ensemble for seasonal-to-annual predictions- Skill and progress beyond DEMETER in forecasting tropi- cal Pacific SSTs. Geophys. Res. Lett., 36, L21711, doi:10.1029/ 2009GL040896.

Wilks, D. S., 1995: Statistical Methods in the Atmospheric Sciences: An Introduction. Academic Press, 467 pp.

C. Oludhe Department of Meteorology, University of Nairobi, Nairobi, Kenya A. Sankarasubramanian and Tushar Sinha Department of Civil, Construction, and Environmental Engineering, North Carolina State University, Raleigh, North Carolina Naresh Devineni and Upmanu Lall Columbia Water Center, Columbia University, New York, New York (Manuscript received 2 November 2012, in final form 3 June 2013) Corresponding author address: A. Sankarasubramanian, Department of Civil, Construction and Environmental Engineering, North Carolina State University, Raleigh, NC 27695-7908.

E-mail: sankar_arumugam@ncsu.edu (c) 2013 American Meteorological Society

[ Back To Technology News's Homepage ]

OTHER NEWS PROVIDERS







Technology Marketing Corporation

800 Connecticut Ave, 1st Floor East, Norwalk, CT 06854 USA
Ph: 800-243-6002, 203-852-6800
Fx: 203-866-3326

General comments: tmc@tmcnet.com.
Comments about this site: webmaster@tmcnet.com.

STAY CURRENT YOUR WAY

© 2014 Technology Marketing Corporation. All rights reserved.